I was looking forward to day 5 but imagine my surprise when I looked down on the site to find that, not only had good progress been made, but that it had gone pink.
This needed closer inspection. It appears that the single blocked footings had now gained a perimeter of boards and a topping of quad rebar.
The various pipes and ducts for services were all in place and the whole lot filled with gravel and then mostly sprayed pink.
I say mostly as there appear to be some areas that have deliberately not been sprayed.
I have no idea about all this so perhaps Uncle Rob can enlighten me as to why the pink and why not everywhere.
Whatever will tomorrow bring. The concrete pour I suspect!